3/30/22 - Per PB suggestions, MM changed the date of the Correlation from 2022 to 2021. Also, MM verified that LiDAR was underneath the inset for traverse in layout. MM saved layout as pdf, sent it to PB and then printed out a map, to be delivered to PB at CPO.
2/18/22 - MM made corrections to the layout (and a couple of OtherPoints locations and the CSA) from an email, with pictures, that PB sent. MM then sent PB a jpeg of completed edits.
11/23/21 - MM did many things today, including making the diabase symbols visible, labelling the Jd lines, putting a box around the Correlation diagram and adding a topo base to the traverses. MM used a printed copy to make these changes and when completed, saved a .jpg for PB.
11/17/21 - MM completes the Correlation Diagram and it is now in the Layout.
11/16/21 - MM begins the process of working on the Correlation Diagram.
11/12/21 - MM labeled the Qal polygons. MM broke up contacts going through the Qal polygons and made them concealed. MM added new entries from the new feature classes to the layouts and arranged them in the layouts.
11/10/21 - MM brought in OtherPoints_SilkHope_2014_2021_2022 and symbolized the points. MM brought in MapUnitPoints_SilkHope2021 and turned the rock unit labels into an annotation label - MapUnitPoints_SilkHope2021Anno2. MM then labeled all the rock units for the map.
11/5/21 - MM added 3 stereonets to the layout. MM added the geochem diagram, from EM. MM added CSA to the MapView and the layout. MM made a change in the rock unit from Zhasi to Zhabsi.
11/2-3/21 - MM continued moving dip numbers around the symbols, until that task was completed on the 3rd. MM then started adding items to the layout that were given to him by PB on the 2nd. MM inserted rock unit descriptions, references and title text to the map. MM also added the traverses (Traverses_Chatham_2015_Present) and the Correlation diagram polylines and polygons.
11/1/21 - MM fixed problems with combining the two points layers and getting dip numbers to show up on top of the symbols. MM started to move the dip numbers around the symbols for the whole quad.
10/28-29/21 - MM tried combining the existing points with Silk Hope and the new points from PB. Something is wrong with the existing points, because it has a column Inclinatio, while the new points have a column for Inclination. On 10/29, unable to figure out what's going on. Will study more next week. MM did arrange dip numbers around many of the symbols.
10/27/21 - MM got points file (Points_Master_SilkHope_21_22_NoDomains) from PB, along with the text (Silk Hope_Intro_and_Description_2021-2022) that will go into the layout. MM discovered that SilkHope in ArcMap was in a personal geodatabase, not a file, so that will cause some difficulties.
10/26/21 - MM began work on this quad again.
9/24/21 - MM added map views in layout for Correlation, GeologistIndex and Traverses.
9/23/21 - PB wants MM to start new layout in Pro. MM created new Pro folder in SilkHope folder in Statemap-Chapel Hill. MM kept old underlying GeoTIFF image and eliminating all other feature classes from the MapView. MM added this GeoTIFF to the layout. MM updated corner coordinates.
Old (below) New (above)
5/13/14 – MM created the DISTRIBUTABLE and PRODUCTION folders and placed the SilkHope_GeoTIFF_from_GeoPDF_clear.tif in the PRODUCTION folder after receiving it from PB.
5/29/14 – MM created the DISTRIBUTABLE geodatabase using ArcToolbox, and this process also created the feature dataset and feature classes. MM opened a .mxd and brought in the GeoPDF to start creating a layout. MM started populating the layout with scale bar, declination, index map, disclaimers, titles, symbols and contacts. MM brought in the longitude and latitude coordinates in the quad view and adjusted them to Silk Hope. MM also created white boxes to hide the yellow overlap of the .tif and brought over the colored rock unit boxes, along with their descriptions.
6/2/14 – MM brought files into the Silk Hope production folder from the T drive. HH emailed me to pick the files up.
6/11/14 – MM is assessing what MM have here. MM transferred feature classes from HH’s Production folder to my DISTRIBUTABLE folder. MM brought everything else into the DISTRIBUTABLE folder. MM grabbed what MM had done in an earlier .mxd (and had wound up in the Recycle bin) and brought it into the current .mxd.
6/12/14 – MM brought in the stereoscopes. MM turned on the text for the Correlation polygons. MM brought in the lat/long coordinates. MM brought in the rock unit description and the colored boxes. MM also brought in all the assorted text from the rock unit description. MM whitened the edges of the GeoTIFF. Tomorrow, MM will put in the SM_CODE for the MasterPoints.
6/13/14 – MM was dealing with the symbols today. MM first added the SM_CODE column and populated it. Then MM added the Symbol column and populated it. Then MM adjusted the Symbol values to reflect their SM_CODE number. Then MM started adjusting the symbols placement on the map. MM finished adjusting the symbols and then made an annotation layer for the dip numbers. MM noticed that with my new procedure for doing as much as MM could in the spreadsheet, that MM changed some numbers from, say, 4.3.4 to 4.3.5 and instead of moving the triangle from one side to the other, it was just reversing the triangle, basically reversing the symbol incorrectly. MM got rid of the stuff ending in5 and hopefully that took care of the problem. Actually, for some reason, the symbol selector was doing the .5 symbols backwards instead of upsidedown. MM fixed that, and tried to restore the symbols to what MM had before. MM had a couple more to do when MM left.
6/16/14 – MM continued moving the dip numbers around the symbols until MM finished the task.
6/17/14 – MM dotted the contact lines through the Qal units. MM turned the fold axes magenta and placed the symbols for the lines on the map. MM labelled the diabase contacts. MM labelled the rock units, then the Qal units. Then MM spent a lot of time in the legend section getting all the symbols, lines and points, as well as making the text looking pretty. MM also had to decorate two lines to be doubly plunging.
6/18/14 – MM worked on the cross section and added labels to the rock units and all the tick marks throughout the cross section. MM printed a paper copy and found errors that needed to be fixed. MM added a new space filler for the Geochemistry analysis from HH. Once MM corrected all the errors, MM printed the map again to give to HH and PB this afternoon.
6/24/14 – After receiving the paper map from RB a few days ago, MM made all the corrections to the map and sent HH and PB a pdf of the map.
6/25/14 – HH sent me a pdf with the corrections. MM made all the changes and emailed her and PB back the new pdf. HH sent me a pdf with a few changes, which MM corrected, and then MM printed out a map for Ken to correct.
12/31/15 - MM uploaded latest version of the Silk Hope map to Google Drive:
https://drive.google.com/drive/folders/0BxSMuI20Ka_kb1VVNENlSXpaUjg
8/3/16 - MM changed Zhadlt (u) to Zhablt. This included changes to CSA and Correlation Diagram. This map is now called OPEN FILE REPORT 2014-02 Revision-01 (2016).